
RERAA KM 30 OF 2021
A few words about the property
Property Description

Land Area
40320 Sq. Ft.*

Construction Area
175000 Sq. Ft.*

Possession
31/03/2023

No. of Blocks
3

Type
Residential + Commercial

Conceptual design, decision to execute or not to be finalized later
Property Highlights
Biometric Access Control Secured Entry
6 Schindler Elevators
3 Levels of Parking for Staff & Visitors
Servant Rooms
360° Clear View of the Hills
Biometric Access Control Secured Entry
6 Schindler Elevators
360° Clear View of the Hills
3 Levels of Parking for Staff & Visitors
Servant Rooms
Amenities of Achyut SRKM Altair

Fire Fighting Systems

CCTV/Video Surveillance

24*7 Security

Power Backup

Elevators

Treated Water Supply
Units Available for Rent/Lease
Unit Name | Carpet Area (Sq. Ft.) | Built Up Area (Sq. Ft.) | Current Status |
COM – 001 (Ground) | 3176 | 3333 | ![]() |
COM – 002 (Ground) | 3782 | 3961 | ![]() |
COM – 101 (1st Floor) | 2196 | 2313 | ![]() |
COM – 102 (1st Floor) | 2212 | 2328 | ![]() |
Specification
Structure
Wall Finishes
Amenities
Bathroom Fitting
Kitchen Fittings
Doors & Windows
Flooring
Main Staircase
Electrical Fittings
Structure
Structure = Compliant with Seismic Zone-V specification
Wall Finishes
- Kitchen = Tiles (600mm high above counter), putty with primer
- Toilet = Ceramic Tiles up to door height, putty with primer
- Common Passage & Lobby = Putty with Primer.
- Bedrooms = Putty with Primer.
- Living Room/Dinning Room = Putty with Primer
Amenities
- Elevators = 6 Passengers Elevators
- CCTV = 24hours CCTV Surveillance in Ground Floor Lobby & Parking Area
- Power Back-Up = 100% power back-up for common area & services, 1KVA power back-up in each apartment.
- Intercom = Voice communication between apartments & security guard room.
- Fire Fighting = As per Fire Recommendation Letter.
- Water = Water filtration plant to make water potable.
Bathroom Fitting
- Sanitary Fitting = Parryware/Hindware/Cera or equivalent as per Model Flat.
- C.P. Fittings = Ess Ess/Cera/Hindware or equivalent as per Model Flat.
- Hot & Cold Water Line = Provision only in bath area
- Geyser = 16A point for Geyser in every toilet
- Exhaust = 6A point for Exhaust in every every toilet
Kitchen Fittings
- Sink = Stainless Steel Sink
- Electrical provisions = Point for Aqua Guard, Electrical Chimney, Microwave Oven & Refrigerator
Doors & Windows
- Main Door = Flush Door
- Windows = Anodized Aluminum Sliding
Flooring
- Bedroom = Vitrified Tiles
- Living Room/Dining Room = Vitrified Tiles
- Kitchen = Vitrified Tiles
- Toilet = Anti-Skid Tiles
- Common Passage & Lobby = Marble/Tiles/Kota
Main Staircase
- Risers & Trends = Marble/Tiles/Kota
- Handrail = M.S.Railing
Electrical Fittings
- Wiring = PVC Concealed wiring with Modular Switches
- Split AC Provision = Living Room & Master Bedroom
- Telephone Point = Living Room
Structure
Wall Finishes
Amenities
Bathroom Fitting
Kitchen Fittings
Doors & Windows
Flooring
Main Staircase
Electrical Fittings
Structure
Structure = Compliant with Seismic Zone-V specification
Wall Finishes
- Kitchen = Tiles (600mm high above counter), putty with primer
- Toilet = Ceramic Tiles up to door height, putty with primer
- Common Passage & Lobby = Putty with Primer.
- Bedrooms = Putty with Primer.
- Living Room/Dinning Room = Putty with Primer
Amenities
- Elevators = 6 Passengers Elevators
- CCTV = 24hours CCTV Surveillance in Ground Floor Lobby & Parking Area
- Power Back-Up = 100% power back-up for common area & services, 1KVA power back-up in each apartment.
- Intercom = Voice communication between apartments & security guard room.
- Fire Fighting = As per Fire Recommendation Letter.
- Water = Water filtration plant to make water potable.
Bathroom Fitting
- Sanitary Fitting = Parryware/Hindware/Cera or equivalent as per Model Flat.
- C.P. Fittings = Ess Ess/Cera/Hindware or equivalent as per Model Flat.
- Hot & Cold Water Line = Provision only in bath area
- Geyser = 16A point for Geyser in every toilet
- Exhaust = 6A point for Exhaust in every every toilet
Kitchen Fittings
- Sink = Stainless Steel Sink
- Electrical provisions = Point for Aqua Guard, Electrical Chimney, Microwave Oven & Refrigerator
Doors & Windows
- Main Door = Flush Door
- Windows = Anodized Aluminum Sliding
Flooring
- Bedroom = Vitrified Tiles
- Living Room/Dining Room = Vitrified Tiles
- Kitchen = Vitrified Tiles
- Toilet = Anti-Skid Tiles
- Common Passage & Lobby = Marble/Tiles/Kota
Main Staircase
- Risers & Trends = Marble/Tiles/Kota
- Handrail = M.S.Railing
Electrical Fittings
- Wiring = PVC Concealed wiring with Modular Switches
- Split AC Provision = Living Room & Master Bedroom
- Telephone Point = Living Room
Download Brochure
Achyut SRKM Altair is approved by


